Click on a photo to enlarge.
Before diving into a recent success story, let's set the scene in Lyons, GA. A home faced a common yet critical setback: sinking concrete piers in the crawl space. A sag in a home’s foundation can be more than a nuisance, hinting at deeper unseen issues. Yet, as showcased in the before image, the challenge was no match for our resolve. By expertly installing the robust SmartJack system, we effectively braced and stabilized the structure. Notice in the after photo how the crawl space now boasts unwavering support, illustrating our dedication to not just fixing homes but ensuring peace of mind. This transformation reflects our mission to deliver a remarkable customer experience backed by dependable, lasting solutions.
In Brooks, GA, a homeowner expressed concerns about sagging floors and a bathroom door that wouldn't shut properly. Our inspector conducted a thorough crawl space assessment and recommended SmartJacks to stabilize the floors and resolve the door alignment issue. With our expert installation, the homeowner's floors are well-supported, eliminating the sagging and ensuring proper functionality. Our reliable solution has provided the homeowner with a more stable living environment, addressing their concerns and improving the overall integrity of their home in Brooks, GA.
A homeowner in Hampton, GA had a small guest addition next to the home that had a severe settling foundation. The foundation wall had sunken into the ground leaving a large gap in the foundation wall. In order to solve the issue, our team installed helical piers, then used our hydraulic lift systems to lift the foundation wall back into position and stabilize it in place.
This home in Griffin, GA had a chimney that was tilting away from the home. Our team was able to help by installing helical piers to correct the level of tilt and stabilize the chimney in place so it could no longer settle.
This home in Stockbridge, GA had a sagging floor that required additional support. Our team at Lowcountry Foundation Repair installed SmartJacks to stabilize the floor so it could no longer continue to settle. The team also attempted a lift on the floor, successfully resulting in a level floor.