There was a 1 inch sag in the living room floor.
There was a 1 inch sag in the living room floor.
Below the floor, the joists needed additional support to hold the weight above.
Below the floor, the joists needed additional support to hold the weight above.
A total of five SmartJacks were needed to support the subfloor.
A total of five SmartJacks were needed to support the subfloor. A PowerBrace beam was also installed to allow the SmartJacks to lift multiple joists in the crawl space.
Lowcountry Basement Systems was able to help Gary.
Lowcountry Basement Systems was able to help Gary by installing a SmartJack System.